The proposed contemporary porch and stair remain visually subordinate to the historic masonry building.
252 Meeting Street has received unanimous conceptual approval from Charleston’s Board of Architectural Review.
The project begins with a three-story masonry building constructed circa 1838. Our approach has been straightforward: preserve the historic structure as the defining architectural element of the site, remove later additions that obscure its original form, and make the new work clearly of its own time.
We were not interested in recreating a historic porch or producing something that might be mistaken for part of the original building. The new porch and stair are intentionally contemporary, but carefully calibrated to the scale, proportion and rhythm of the existing structure.

Keeping the historic building legible
The historic masonry building remains the dominant presence. The new intervention is located largely outside its original footprint, reducing penetrations into the historic fabric and allowing the building’s form to remain clearly readable.
An open steel frame and railings minimize the visual mass of the new construction. Wood soffits and a screened ground level bring warmth and depth without competing with the masonry structure. The result is differentiated from the original building, but not disconnected from it.
That balance was the central question throughout the review: how to support a continued use of the building while preserving the legibility and permanence of what is already there.

Contemporary, but compatible
Charleston’s architectural character does not come from every building looking the same. It comes from a collection of structures that respond carefully to scale, climate, material and the street.
For us, compatibility did not mean imitation. It meant designing an intervention that understands its role. The historic building should still be the first thing you see. The new work should be quieter, lighter and clearly identifiable as an addition.

The unanimous conceptual approval is an important step forward for the project. We will now continue refining the materials, detailing and connections as the design advances through the next stages of review.
It is also a meaningful milestone for our work in Charleston, a city where architecture and preservation are treated as consequential public work.

